Ordering wall frames and roof trusses involves more than choosing a manufacturing package. You also need to decide who will receive, unload, lift, erect, brace and check the components on site.
A supply only frames and trusses package gives an experienced builder greater control over installation, while a combined supply and installation package places more of the work under one contractor. The appropriate option depends on your site team, access, construction program and the responsibilities set out in writing.
Under a supply-only arrangement, the manufacturer typically designs, details, fabricates and delivers the quoted components. The builder then manages installation using an appropriately skilled framing team.
A typical supply scope may include:
Inclusions vary between suppliers. When comparing supply only frames and trusses, rely on the written quotation rather than assuming that unloading, lifting equipment, hardware, labour or site supervision is included.
Under supply only, the builder commonly prepares the site, coordinates access and arranges unloading or craneage. They also organise erection, bracing, tie-downs, structural connections and protection after delivery.
Installation should follow the latest approved drawings and manufacturer documentation. Frames and trusses should not be cut, drilled, notched or otherwise altered without the appropriate approval.
Temporary bracing is also important during erection. It helps keep trusses stable and correctly positioned until the required permanent bracing and restraints are installed. Installation must follow the supplied design and bracing documentation.
A supply and installation package adds an agreed erection component to the manufacturing scope. Depending on the quotation, this may include placing wall frames, installing roof trusses and completing nominated bracing or connections.
A combined package does not automatically cover every site cost. Craneage, scaffolding, edge protection, traffic control, difficult access, site preparation or return visits may remain separate.
The contract should clearly state who:
The choice between supply only and supply and installation changes who coordinates each stage and manages delays between delivery and erection.
With supply only frames and trusses, the builder controls the installation crew, lifting sequence and site program. This can suit builders with established framing teams and experience working with prefabricated systems.
A combined package can reduce the number of handovers, but the foundations, supports, set-out, access and required safety systems still need to be ready. The project team must understand and manage any exclusions.
Supply only may suit a builder with an experienced framing crew, established crane contacts and suitable site supervision.
Potential advantages include:
However, these benefits depend on good coordination. A lower manufacturing price can be offset by urgent craneage, additional labour, return deliveries, storage requirements or poor handling.
Supply and installation may suit builders who want one contractor to coordinate manufacturing and erection. It can reduce the need to source and manage a separate installation crew.
It may also be useful where site resources are limited or the structure has more complex framing requirements.
The value of a combined package depends on its actual scope and coordination responsibilities, not simply the quoted price. Confirm installation availability during the enquiry process and obtain written details of all inclusions, exclusions and site-readiness requirements.
Different quotations can show significantly different totals because they may cover different responsibilities.
Before comparing supply only frames and trusses with a combined package, assign each responsibility to a specific scope.
Check whether each quotation includes:
This provides a more realistic comparison of total project cost than looking at the manufacturing subtotal alone.
Whether you choose supply only or supply and installation, the site needs to be ready for the agreed delivery or erection process.
Confirm that set-out, supports, floor levels and relevant structural elements match the approved information. Safe access must also be available for the delivery vehicle and any crane or lifting equipment.
Clear the unloading and storage area before delivery. Components should be supported appropriately and protected from damage, distortion and weather. Follow the supplier's instructions when moving and storing packs.
Under supply only frames and trusses, the builder will generally coordinate these arrangements. Responsibilities only shift to the installer where the contract specifically provides for them.
Manufacturing should be based on the final approved architectural and structural information.
Changes to openings, wall heights, roof pitch, supports, loads or service requirements can affect the framing and truss package.
Report relevant changes before production or delivery. Site crews should not modify components simply because an outdated plan was used. Where a change affects the design, obtain the appropriate review and written documentation before proceeding.
Keep the latest layouts and relevant installation information available on site. Truss positions, special load points and bracing requirements must be followed.
Check the delivery documentation promptly when components arrive. Record visible damage, missing items or incorrect labels and notify the supplier as soon as possible.
The quotation or contract should explain responsibility for damage after delivery, approval of repairs and any charges associated with replacement or return visits.
Never alter a truss based solely on verbal advice. Obtain the required written engineering or design detail before work continues where a structural modification is proposed.
The supply-only quotation will generally be lower than a combined supply and installation price because erection labour is excluded. However, the total installed cost may not be lower.
When comparing options, consider:
An experienced crew may make supply only frames and trusses an efficient option. Without the right labour, equipment or access plan, however, a combined package may provide greater cost and program certainty.
The most useful comparison is therefore the total scope and responsibility, rather than the initial manufacturing figure.
Before accepting a quotation, ask:
Written answers reduce assumptions and help ensure that contractors are pricing the same scope.
The appropriate model depends on the builder's people, equipment and systems.
Supply only frames and trusses can provide greater control for an experienced construction team, while a combined supply and installation package can reduce coordination between the manufacturer and separate framing contractors.
Before delivery, settle the final drawings, access arrangements, lifting requirements, storage, labour, bracing and responsibility for variations. A clear quotation and responsibility schedule can help prevent costly confusion on site.
ABC Frames & Trusses has manufactured prefabricated timber wall frames, roof trusses and flooring components for residential projects across Sydney and regional NSW since 1986\.
From its St Marys facility, the company estimates, constructs and delivers products using modern technology and machinery, supported by MiTek software and development.
Contact the estimating team to discuss your drawings, delivery requirements and supply only frames and trusses quotation.